Retroactive Baseline Data: Allowing Manual Entry
K
Kathleen Keaney
I added a goal to client session to track duration data for opting out/task refusal, after adding the program I notified staff to begin tracking the duration (but didn't realize I forgot to put the status of the goal to baseline & add to the session). So the RBT collected the data and wrote the duration times in their narrative session of the session notes. I recognized my mistake during the next supervision session, and the RBT was able to begin collecting and graphing data in the moment during sessions.
I wanted to manually insert the two data points for the sessions in which the RBT manually collected duration data, but am not able to insert it when I click "edit session data" because the goal was not in active status at the time. I can put it in when I click "manual session entry" but when I do it that way it creates a whole extra session that looks like it was never connected to an appt or sent for billing rather than adding just that one data point to the pre-existing graph.
I would like a way to manually enter baseline data points to a graph when in the edit mode for the individual program for times like this when only one data point needs to be edited/added (regardless of the "goal status")